Name
Badan Pengkajian dan Penerapan Teknologi (BPPT)
Location
Sepong, Banten
As the executor, Syntek has successfully implemented the Smart Microgrid system which was conceptualized and designed by BPPT.
The system consists of 100 kWp PLTS, 10 kWh Li-Ion Battery, Smart Meter, Weather Station, SCADA, and PLC.
The system is implemented on the roof of the B2TKE-BPPT building in Puspiptek, South Tangerang. The purpose of this activity is to create a microgrid laboratory as a place for education, research and development of the Smart Microgrid system.